Gas turbine exhaust system retrofit at a refinery

By AITESA

AITESA delivers an engineered solution with a new diverter damper, designed for an existing installation and with an opening and closing time of under 43 seconds, verified through functional testing.

AITESA has been involved in upgrading the gas turbine exhaust system at a refinery in Spain, designing and supplying equipment to route exhaust gases between the bypass stack and the heat recovery steam generator (HRSG).

The project had to meet two key requirements: achieve the actuation times specified for changes between operating modes and integrate the new equipment with existing connections, within the constraints of a plant shutdown.
To address these requirements, AITESA combined engineering, 3D modelling, computational fluid dynamics (CFD) analysis, equipment design and supply, together with technical support during installation.

El reto: renovar el sistema de gases de escape de una turbina existente

The challenge: upgrading the exhaust system of an existing gas turbine

The installation handles turbine exhaust gases at temperatures above 500 °C and a flow rate of approximately 150 kg/s.
The system incorporates a diverter damper to direct exhaust gas flow either towards the HRSG or to the bypass stack, depending on the plant’s operating requirements.
One of the client’s principal requirements was for the diverter damper to complete its opening and closing manoeuvres in less than 43 seconds.
This requirement was intended to enable sufficiently rapid transitions between turbine operating modes without a loss of pressure in the plant’s steam line.

The replacement system also had to fit an existing installation, with significant mechanical integration and scheduling constraints.

The solution: a new diverter damper and associated exhaust equipment

AITESA developed an integrated solution covering the engineering, design and supply of the main components of the exhaust gas system.

The scope included:

  • Engineering and design of the exhaust gas system.

  • Analysis of gas flow behaviour using CFD simulation.

  • Design and supply of the diverter damper and guillotine damper.

  • Internally lined ductwork suitable for high-temperature service.

  • Expansion joints and sealing solutions.

  • An industrial silencer.

  • Technical support and supervision during installation.

The design and configuration were developed around the operating temperatures, gas flow rate, actuation requirements and restrictions imposed by the existing plant layout.

Brownfield integration: adapting to three existing connections

A central challenge was integrating the new equipment into a system with three established tie-in points: the gas turbine, the bypass stack and the heat recovery boiler.
Each connection had different as-built conditions, requiring the design to be adapted to the actual geometry of the installation.

AITESA developed a 3D model of the system to check the fit of the equipment and define the changes required.

During the project, some new components also had to be manufactured and previously fabricated parts adapted to suit the conditions encountered on site.
These activities required technical responsiveness and coordination with the tight timescales of a plant shutdown, when modifications must be resolved within a limited intervention window.

Integration engineering was therefore a key part of the project, alongside the equipment supply itself.

Verified result: opening and closing time requirement met

One of the project’s most demanding operational requirements was for the diverter damper to complete its opening and closing manoeuvres in under 43 seconds.

Functional testing of the equipment confirmed compliance with the actuation time specified by the client.

This verifies a principal acceptance criterion for the equipment supply and addresses the need for rapid changeovers between the intended turbine operating modes.

In parallel, the 3D modelling and component adaptations enabled the design to accommodate the geometrical constraints of the three existing connections.

Integration engineering for existing industrial facilities

La renovación de un sistema de gases de escape no depende únicamente de las prestaciones de los equipos suministrados.

Upgrading a gas turbine exhaust system depends on more than the performance of the individual items supplied.

This project demonstrates AITESA’s ability to address equipment design and brownfield integration together, responding to specific operating requirements and modifications arising during execution.

At this stage of the project, compliance with the actuation time requirement and adaptation of the design to the existing connections are the principal confirmed technical outcomes.

Solutions for gas turbine exhaust systems

AITESA provides engineering and diverter damper solutions, together with associated equipment, for gas turbine exhaust systems and heat recovery installations.

For projects involving the replacement or modification of an existing exhaust system, operating conditions and key site constraints can be shared with AITESA so that its team can understand the requirements and assess suitable solutions.